Restavba

Listing-ready in five weeks.

Fixed price, fixed date, materials chosen to survive tenant turnover.

  • Fixed price
  • Fixed deadline
  • 24-month warranty
  • Callback in 4 hours

Numbers we plan around before you sign

  • 4–5 weeksTypical empty-unit turnaround
  • 0.6–1.2M CZKQuality-grade 2+kk renovation band
  • 6–12%Modelled rent uplift vs. pre-renovation

A price for your flat

Tell us about your project and get a price estimate.

A few questions about the project + your contact, about fifty seconds. We call back within 4 hours with an estimate and book a free site visit — that's where we lock the timeline, materials and final price.

01/04

What do you want to renovate?

What we optimise for investors

  • 01Durable, tenant-resilient surfaces. Lighting that flatters the listing photos.
  • 02Schedule sized so the flat goes back on Sreality / Airbnb the same week we hand over.
  • 03Documentation pack your accountant can file without re-asking the site for drawings.
  • 04If you sell, the same documentation transfers to the buyer's technical due diligence.

Six steps from first call to the day you walk in.

  1. Tell us the basics

    Use the calculator or call. Roughly fifty seconds.

  2. Site visit within three days

    We measure, photograph and ask the questions a quote actually needs.

  3. Written quote within five days

    A real number, line by line. No "about" and no "from".

  4. Contract with a penalty for late delivery

    Price and date are legally binding from the moment you sign.

  5. Build with weekly photo updates

    One named project manager. One thread. A photo set every Friday.

  6. Handover and 24-month warranty

    Documentation pack, warranty terms in writing, snags closed before sign-off.

Four things most renovation firms won't put on paper.

  • Fixed price

    What's on the quote is on the invoice. No mid-job add-ons.

  • Fixed date

    The date is in the contract. We pay if we miss it.

  • 24-month warranty

    On the work, materials and trade coordination.

  • A system, not a crew

    Before anyone lifts a hammer, every metre is priced and every hour is scheduled. Trades overlap on site — they don't wait for each other. That's how we deliver faster, without the chaos.

Renovation without the chaos.

We sort the price, the date and the coordination before anyone lifts a hammer. You watch your flat being built.

Before the first hammer falls, we have the price, the deadline, and the full schedule on paper. One project manager — one contact from the first visit to handover.

Every Friday, you get photos from the site.

Read more
Restavba — coordinating a renovation in Prague

Investor-specific questions

Yes. We tune the scope to what your agency will photograph and refuse to list without.

Tell us about the project. We'll call you back within four hours.

Fifty seconds in the calculator, then a real conversation. No autoresponders.