Restavba

Panel-block bathroom core, replaced in three weeks.

Bathroom, WC and risers in panelák flats. Your neighbours will still talk to you afterwards.

  • Fixed price
  • Fixed deadline
  • 24-month warranty
  • Callback in 4 hours

A price for your flat

Tell us about your project and get a price estimate.

A few questions about the project + your contact, about fifty seconds. We call back within 4 hours with an estimate and book a free site visit — that's where we lock the timeline, materials and final price.

02/04
CZK 770,000 – CZK 1,790,000

How big is the bathroom core?

Jurij Ciko, Restavba project manager

Jurij Ciko — project manager

I'll walk you through the whole renovation. From the first visit to the keys in your hand.

Six steps from first call to the day you walk in.

  1. Tell us the basics

    Use the calculator or call. Roughly fifty seconds.

  2. Site visit within three days

    We measure, photograph and ask the questions a quote actually needs.

  3. Written quote within five days

    A real number, line by line. No "about" and no "from".

  4. Contract with a penalty for late delivery

    Price and date are legally binding from the moment you sign.

  5. Build with weekly photo updates

    One named project manager. One thread. A photo set every Friday.

  6. Handover and 24-month warranty

    Documentation pack, warranty terms in writing, snags closed before sign-off.

What our clients say.

Real names. Real address. Real apartment.

  • Jana K. — Prague 8, Libeň

    We moved in with my parents for five weeks and got photos from the flat every Friday. The contract price and the invoice matched to the koruna. They hit the handover date to the day — that's what sold us most.

  • Tomáš B. — Prague 3, Žižkov

    32 m², done in five weeks. I'd had a bad experience before, so I was skeptical. The fixed price in the contract was the reason I signed. The invoice matched.

  • Petra M. — Prague 4, Nusle

    They handled everything — coordination, materials, communication. I had one person to message. The apartment was handed over clean, with a binder of all the documentation.

  • Radek and Lucie N. — Prague 8, Bohnice

    68 m² panel-block apartment, completely rebuilt. Seven weeks, as agreed. The new layout works exactly as we planned on the first visit. No surprises.

What replacing the core actually means.

  • Removal of the prefab unit down to the risers
  • Riser connections with sound insulation where needed
  • Wet room rebuild to current building norms
  • WC, basin and ventilation
  • Tiling, doors and finishes per the SVJ rules
  • Pressure tests, documentation and handover

Typical core replacement.

Two to three weeks on site once riser slots are agreed with building management.

  1. Strip-out, riser preparation, first-fix — Days 1–5

    Days 1–5

    Strip-out, riser preparation, first-fix

  2. Wet cells, screed, waterproofing — Days 6–12

    Days 6–12

    Wet cells, screed, waterproofing

  3. Tiling, sanitaryware, doors — Days 13–18

    Days 13–18

    Tiling, sanitaryware, doors

  4. Tests, neighbour notice, handover — Days 19–21

    Days 19–21

    Tests, neighbour notice, handover

Four things most renovation firms won't put on paper.

  • Fixed price

    What's on the quote is on the invoice. No mid-job add-ons.

  • Fixed date

    The date is in the contract. We pay if we miss it.

  • 24-month warranty

    On the work, materials and trade coordination.

  • A system, not a crew

    Before anyone lifts a hammer, every metre is priced and every hour is scheduled. Trades overlap on site — they don't wait for each other. That's how we deliver faster, without the chaos.

Renovation without the chaos.

We sort the price, the date and the coordination before anyone lifts a hammer. You watch your flat being built.

Before the first hammer falls, we have the price, the deadline, and the full schedule on paper. One project manager — one contact from the first visit to handover.

Every Friday, you get photos from the site.

Read more
Restavba — coordinating a renovation in Prague

About panel-block cores.

We follow the building's rules. Where the bylaws require a technical supervisor, that person joins the first meeting with us.

Tell us about the project. We'll call you back within four hours.

Fifty seconds in the calculator, then a real conversation. No autoresponders.