Some of what we've recently delivered.
68 m² · 7 weeksBohnice panel apartment — full renovation from 3+kk to 3+1
Full gut-and-rebuild of a 3+kk panel apartment in Bohnice (68 m²) reconfigured to 3+1: complete strip-out including the original prefab…
64 m² · 7 weeksFull gut renovation, Nusle apartment
Full gut-and-rebuild of the Nusle apartment (64 m²): strip-out and new fit-out, all-new electrics, water and drainage, structural wall and…
- 32 m² · 5 weeks
Full 1+kk apartment renovation, Zizkov
Full gut-and-rebuild of a 1+kk apartment in Zizkov (32 m²): strip-out, new electrics, water and drainage, masonry and partitions, windows…
A price for your flat
Tell us about your project and get a price estimate.
A few questions about the project + your contact, about fifty seconds. We call back within 4 hours with an estimate and book a free site visit — that's where we lock the timeline, materials and final price.
What would you renovate?
Pick everything that's in the plan — even tentatively.
Six steps from first call to the day you walk in.
Tell us the basics
Use the calculator or call. Roughly fifty seconds.
Site visit within three days
We measure, photograph and ask the questions a quote actually needs.
Written quote within five days
A real number, line by line. No "about" and no "from".
Contract with a penalty for late delivery
Price and date are legally binding from the moment you sign.
Build with weekly photo updates
One named project manager. One thread. A photo set every Friday.
Handover and 24-month warranty
Documentation pack, warranty terms in writing, snags closed before sign-off.
What our clients say.
Real names. Real address. Real apartment.
Jana K. — Prague 8, Libeň
We moved in with my parents for five weeks and got photos from the flat every Friday. The contract price and the invoice matched to the koruna. They hit the handover date to the day — that's what sold us most.
Tomáš B. — Prague 3, Žižkov
32 m², done in five weeks. I'd had a bad experience before, so I was skeptical. The fixed price in the contract was the reason I signed. The invoice matched.
Petra M. — Prague 4, Nusle
They handled everything — coordination, materials, communication. I had one person to message. The apartment was handed over clean, with a binder of all the documentation.
Radek and Lucie N. — Prague 8, Bohnice
68 m² panel-block apartment, completely rebuilt. Seven weeks, as agreed. The new layout works exactly as we planned on the first visit. No surprises.
Common-area work we routinely deliver.
- Entrance and lobby finishes, postboxes, lighting
- Stair railings, anti-slip strips, contrast nosings
- Walls and floors to fire and acoustic class
- Step-free ramps and handrails to current code
- Lettering, intercom, CCTV first-fix in agreement with the SVJ
- Bins, lift-lobby upgrades subject to landlord approval
Phased around residents.
Noisy work and lift shutdowns are scheduled. Total length depends on assembly votes and material lots.
Step 1
General meeting: scope, budget, optional reserve
Step 2
Technical survey and material samples for the vote
Step 3
Contract with milestone dates
Step 4
Phased build, resident comms, handover
Four things most renovation firms won't put on paper.
Fixed price
What's on the quote is on the invoice. No mid-job add-ons.
Fixed date
The date is in the contract. We pay if we miss it.
24-month warranty
On the work, materials and trade coordination.
A system, not a crew
Before anyone lifts a hammer, every metre is priced and every hour is scheduled. Trades overlap on site — they don't wait for each other. That's how we deliver faster, without the chaos.
Renovation without the chaos.
We sort the price, the date and the coordination before anyone lifts a hammer. You watch your flat being built.
Before the first hammer falls, we have the price, the deadline, and the full schedule on paper. One project manager — one contact from the first visit to handover.
Every Friday, you get photos from the site.


