ProjectsLibeň · 43 m² · 7 weeks
Complete 1+1 apartment renovation, Liben
Complete 1+1 apartment renovation (43 m²): new electrical, plumbing and heating distribution, new switchboard, floor leveling, wall plastering and skim coat, painting, flooring and large-format bathroom tiling, custom kitchen, new interior doors, and final finish works.

- 43 m²Size
- 7Weeks
- LibeňLocation
Before / after
Same project. Documentation-grade shots, not a stock montage.
Complete 1+1 apartment renovation, Liben
Brief
43 m² 1+1 apartment (separate kitchen, separate room, loggia, bathroom with WC, and a small entrance hall). The goal was a complete renovation of the whole apartment.
Scope
- Demolition works and construction waste removal
- New electrical distribution including a new apartment switchboard
- New plumbing, drainage and heating distribution
- Floor leveling, new floor layers and final flooring installation
- Wall leveling, plaster and skim coat, complete painting
- Tile installation with large-format bathroom tiles
- Bespoke kitchen with full utility integration
- New interior doors and finishing works
Timeline
Survey: day 0. Quote: day 3. Contract: day 8. Start: day 17. Handover: week 7.